Featured Articles

TSMC: Volume production of 16nm FinFET in 2H 2015

TSMC: Volume production of 16nm FinFET in 2H 2015

TSMC has announced that it will begin volume production of 16nm FinFET products in the second half of 2015, in late…

More...
AMD misses earnings targets, announces layoffs

AMD misses earnings targets, announces layoffs

AMD has missed earnings targets and is planning a substantial job cuts. The company reported quarterly earnings yesterday and the street is…

More...
Did Google botch the Nexus 6 and Nexus 9?

Did Google botch the Nexus 6 and Nexus 9?

As expected, Google has finally released the eagerly awaited Nexus 6 phablet and its first 64-bit device, the Nexus 9 tablet.

More...
Gainward GTX 970 Phantom previewed

Gainward GTX 970 Phantom previewed

Nvidia has released two new graphics cards based on its latest Maxwell GPU architecture. The Geforce GTX 970 and Geforce GTX…

More...
EVGA GTX 970 SC ACX 2.0 reviewed

EVGA GTX 970 SC ACX 2.0 reviewed

Nvidia has released two new graphics cards based on its latest Maxwell GPU architecture. The Geforce GTX 970 and Geforce GTX…

More...
Frontpage Slideshow | Copyright © 2006-2010 orks, a business unit of Nuevvo Webware Ltd.
Wednesday, 05 September 2012 09:57

TSMC announces 10nm timetable

Written by Nick Farrell



450mm wafers by 2018

TSMC has finally gotten around to announcing a roadmap for the mass-production of next-generation 10nm wafers. It seems that TSMC will have everything ready by 2018. The chipmaker delayed in making 450mm wafers, which were originally scheduled in 2015.

It said that the delay was caused by semiconductor equipment suppliers’ postponement in developing advanced equipment for manufacturing amid the industrial slump. The 450mm wafers would help solve the problem of rising costs in making advanced chips, allowing TSMC to provide affordable 10 nanometer chips with FinFET transistors for customers.

J.K. Wang, vice president of TSMC’s operation in charge of 300mm factories, told a media briefing that it was the cost constraints rather than technological constraints for chipmakers to migrate to next-generation chips via shrinking chip geometry, he said.

Chipmakers can get 2.5 times more chips from a 450mm wafer than from a 300mm wafer. TSMC planned to build a pilot production line to make 450mm wafers between 2016 and 2017, when semiconductor ASML Holding NV had its key equipment ready in 2015, Wang said. The chipmaker would consider building major 450mm-wafer production lines in Greater Taichung, he said.

Nick Farrell

E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it
blog comments powered by Disqus

 

Facebook activity

Latest Commented Articles

Recent Comments